Temporary Chain Link Panel Fence
Fast to set, easy to reconfigure, and sized from 4 to 12 feet depending on your site and how exposed it is to wind.

Where it fits
A perimeter that keeps up with the job
Panel fence is the workhorse for construction sites, events and storage yards. Because panels go up and come down quickly, the layout can change as your job changes: another gate when deliveries shift, a new line when the work moves into the next phase. We size the panels and the bracing to your site, so the fence line holds through a windy weekend.
Before you order
Questions worth answering
01
Height for the job
Panels run from 4 to 12 feet. The right height depends on what you are protecting, who walks past, and how exposed the site is.
02
Wind and screening
Screening turns fence into a sail, so bracing and panel choice matter. We plan them together, before anything goes up.
03
Access points
Crews, deliveries, and inspectors rarely use the same gate well. We place gates where your site actually moves.
How it works
From site walk to removal
Tell us about the site, the duration, the access points, hours of operation, and nearby foot traffic. You receive a written scope with fence type, footage, gate locations and sizes, screening, install and removal dates, and pricing. We install on the date we committed to, respond when you need a move or an add, and remove everything when the job closes out. A quick email to tempfence@fsilv.com or 15 minutes on the phone usually gets it started.

Frequently asked questions
How tall should my temporary fence be?
It depends on the site. Our panel fence is sized from 4 to 12 feet, and we choose the height based on what you are securing, the foot traffic past the site, and wind exposure. [TEAM INPUT — the heights most jobs use, e.g. for construction vs. events.]
What do you need from me for a quote?
Send us the site address, your start date, and a site plan if you have one. We come back with a written scope and a price you can put in front of a client or a council.
What does the price include?
Everything you need, with one exception: repair and replacement costs for any unexpected damage. The number on the quote is the number on the invoice, because we scope your site correctly from the start.
What if the job changes after install?
We respond when you need a move or an add, and changes go through written change orders, so the scope and the invoice always match.
Most jobs need a combination
More of what we install
Let’s plan your perimeter
Send us the site address, your start date, and a site plan if you have one. Not sure what you need? Start with the Perimeter Planner.